Zeile 23: Zeile 23:
* Updating the model
* Updating the model
* Updating Solidworks. The Servo holder has to be redesigned
* Updating Solidworks. The Servo holder has to be redesigned
* Designing all the components (servo, gyro, encoder, solid ring and other components) in the solidworks to make it a pre production model
* Designing all the components (servo, gyro, encoder, solid ring and other components) <br>
in the solidworks to make it a pre production model
* Make a baugruppe
* Make a baugruppe
* We have to include the PCB in our design (instead of Arduino)
* We have to include the PCB in our design (instead of Arduino)

Version vom 28. Juli 2023, 15:38 Uhr

# Termin Planung für die Folgewoche Fortschritt
1 21.07.2023
  • Defining the requirements
  • Creating a model for the system
  • 3d Solidworks design and print
  • Set up the components
  • The draft requirements have been done (but it will face lots of correction as we understand)
  • We have an initial model. We have to check that model if it is errorless
  • We remodelled the design. We took all the measurements. Now we will put it in solidworks
  • We started designing it in solidworks
2 27.07.2023
  • Updating the requirements ( First we were told to do the project with Arduino, so we included Arduino in our requirements

and then we were told that Arduino is only be part of the initial testing, not in the main model.
So as we already added the Arduino to our design and work flow, we have to remove it.

  • Updating the model
  • Updating Solidworks. The Servo holder has to be redesigned
  • Designing all the components (servo, gyro, encoder, solid ring and other components)

in the solidworks to make it a pre production model

  • Make a baugruppe
  • We have to include the PCB in our design (instead of Arduino)
  • We have the initial set of requirements
  • We started redesigning the initial solidworks model
  • The components (servo, GY35, Encoder, Slip ring) are dewsigned in Solidworks
  • We made a Baugruppe
  • Mr. Ebmeyer gave us further instruction. We are following them.
3 03.08.2023
4 10.08.2023
5 17.08.2023